Plasma arc waste disposal

Principle of Operationcurrently conducting an RFP process to determine
Relatively high voltage, high current electricity isa long-term solution for waste management.
passed between two electrodes, spaced apart,Plasco is not proposing that Metro Vancouver
creating an electrical arc. Inert gas under pressurediscontinue the RFP process, but rather to
is passed through the arc into a sealed containerestablish an interim solution that can quickly
of waste material, reaching temperatures as highaddress the shortfall in landfill capacity, while also
as 25,000 F (13,900 C) in the arc column. Theproviding a facility that will allow Metro Vancouver
temperature a few feet from the torch can beto closely scrutinize and evaluate this new
as high as 5,0008,000 F (2,7604,427 C). Attechnology as part of its long-term decision
these temperatures, most types of waste aremaking process.
broken into basic elemental components in aPort Hope, Ontario, Canada (Sunbay Energy
gaseous form, and complex molecules areCorporation)
separated into individual atoms.Utilizing technology licensed from Europlasma, the
The reactor operates at a slightly negativeplasma arc facility proposed for lands in the
pressure, meaning that the feed system isvicinity of Wesleyville in Port Hope, Ontario
complemented by a gaseous removal system,(approximately 45 minutes east of Toronto) will
and later a solid removal system. Depending onhandle 400 short tons (360 t) per day of
the input waste (plastics tend to be high inMunicipal Solid Waste (MSW) and Tire Derived Fuel
hydrogen and carbon), gas from the plasma(TDF). Sunbay Energy is currently obtaining the
containment can be removed as syngas, and mayrequired approvals from Provincial authorities and
be refined into various fuels at a later stage.intends to have the facility operational during the
The latest independent review of plasma4th Quarter of 2009.
technology providers was undertaken by JuniperTallahassee, Florida (Green Power Systems)
Consulting in 2008, as well as a separateThe city of Tallahassee, Florida has signed the
independent review on Alter NRG /Westinghouselargest plasma arc waste to energy contract
technology.(35 MW) to date with Green Power Systems to
Existing facilitiesprocess 1,000 short tons (910 t) daily from the
National Cheng Kung University - Tainan City,city and several surrounding counties. Completion
Taiwan (PEAT International)of the project is scheduled for October 2010.
PEAT International constructed a plasma arcHirwaun, Wales (EnviroParks Limited)
waste disposal facility at National Cheng KungEnviroParks Limited plan (31/9/07) a consortium
University (NCKU) in Tainan City, Taiwan, whichto build an Organic Park in Tower Colliery at
uses its proprietary Plasma Thermal DestructionHirwaun, South Wales. This includes a plasma
Recovery method. The facility is able to handle 35gasification plant combined with advanced
metric tons (3.35.5 short tons) of waste per dayanaerobic digestion to divert municipal solid waste
from a variety of waste streams, includingfrom the landfill. Enviroparks are currently
incinerator fly ash, medical waste, organic industrialcollaborating with partner Europlasma of Bordeaux
process waste and inorganic sludges. It can alsoto provide the plasma gasification unit to the park.
process waste consumer batteries and otherAs much as 60 million is being put into the project
materials, including heavy metal sludges, andby EnviroParks Ltd and its partners, to establish
refinery catalysts (waste streams that wouldorganic waste and mixed waste treatment
generate valuable metal alloys). The facility wasfacilities next to the Tower Colliery at Hirwaun.
constructed as part of a comprehensive resourceThe Hirwaun site itself is large enough for the
recovery facility funded by the Taiwaneseprocessing of over 250,000 metric tons (280,000
government, marking the first time theshort tons) of non-hazardous waste a year.
Government of Taiwan committed financial andInitially, though, an anaerobic digestion plant will be
technical resources to the utilization of plasmadesigned to handle 50,000 metric tons (55,000
technology. It was commissioned in Novembershort tons) of organic wastes a year.
2004 and received its operating permit in January,Jackson, Georgia (PR Power Company)
2005. PEAT has been an active participant in thePR Power Co. plans to open a plant south of
operations and maintenance of the facility onAtlanta, near Jackson, Georgia, that will use a
behalf of NCKU for its research purposes."plasma torch" to vaporize tires down to their
Yoshii, Utashinai, and Mihama-Mikata, Japan (Hitachinatural elements mainly hydrocarbons and scrap
Metals Ltd.)steel. The gases will be converted to electricity
Three similar small plants are in operation in Japanfor sale to electric utilities and the scrap steel will
a 166-short-ton (151,000 kg) per day "pilot" plantbe sold at an estimated $50 a ton.
in Yoshii, co-developed by Hitachi Metals Ltd. andRed Deer, Alberta (Plasco Energy Group Inc.)
Westinghouse Plasma, which was certified after aPlasco is preparing to start construction on a
demonstration period in 19992000; a 165-short-toncommercial-scale facility in Red Deer, Alberta in
(150,000 kg) per day plant in Utashinai City,the Summer of 2009. This facility, the company's
completed in 2002; and a 28-short-tonfirst commercial plant, is expected to be
(25,000 kg) per day plant commissioned by thecompleted by the end of 2010.
twin cities of Mihama and Mikata in 2002. TwoMaharastra Enviro Power Limited, SMSIL Pune,
similar facilities run by different companies inMaharastra India
Australia and Germany closed after changes inSMS Infrastructures Limited (SMSIL), Central India
senior management.largest civil engineering and infrastructure
Ottawa, Ontario, Canada (Plasco Energy Groupdevelopment company, constructed 68
Inc.)tonne-per-day hazardous waste-to-energy plants,
A new and different type of plasma arc wastelocated in Pune, India, that will use Westinghouse
conversion that uses plasma to refine gasesPlasma Corporation (WPC) plasma technology and
produced during waste conversion, rather than toreactor vessel design. Each plant will provide
destroy waste by brute force as do other plasmacomprehensive disposal services for a wide
systems, has yet to show itself to be successfulvariety of hazardous waste, and will produce up
on a full commercial scale. Plasco Energy Groupto 1.6 MW (net) of electricity
completed a plasma-arc waste demonstrationThe facilities will be the largest plasma gasification
plant in Ottawa, Canada at the Trail Road Landfill,WTE plants in the world processing hazardous
to process 85 metric tons (94 short tons) perwaste.
day of municipal solid waste. Unlike other plasmaConcerns
waste processing facilities, Plasco Energy Group'sNumerous municipal plasma arc gas plants (see
process does not use plasma to destroy waste,above) are currently in development, including one
but rather to refine gases produced during wastefor the city of Los Angeles. Practical (limited use
conversion, in order to allow them to be used toof land space for landfills), technological (large-scale
run an internal combustion gas engine. On 24use of technology versus small-scale, e.g. plasma
October 2007, the Plasco Trail Road facility beganarc is currently favored as a means to destroy
delivering power to the grid.medical and hazardous waste), logistical
The Plasco conversion system, which uses plasma(transportation infrastructure requirements) and
to refine gases rather than expose them tobudgetary considerations can affect the viability
extremely high temperatures, and whose liner isof individual projects. It is important to note that
composed of refractory brick rather than metal,no municipal-scale waste disposal plasma arc
is not susceptible to premature attack of vesselfacilities have as yet been constructed, which
liners. Plasco's internal studies claim that itscould present a considerable technological and
emissions are also much lower than any otherbudgetary challenge to even the largest
thermal waste processing system. By convertingmunicipalities.
waste to CO2 and water, rather than toAn issue regarding plasma systems that rely on
methane, the greenhouse gas emissions of thehigh temperatures for processing is in the life of
process might be much less than competingtheir liners. The liner is an important aspect of
technologies such as landfills. Plasco Energy isseparating the high interior temperatures of the
proposing a scaled up residual waste plasmaplasma system from the [metal] shell of the
gasification facility for Los Angeles, California.plasma container. Liners are highly susceptible to
In an update to local area residents on 6both chlorine attack and to local variabilities in
December 2008, Plasco president Rod Bryden[high] temperatures, both of which would be
said delays at its facility were caused byfound with typical municipal waste systems, and
malfunctioning machinery, not problems with theare not likely to last more than a year in service.
waste-to-energy technology.This concern can be addressed by using the
Faringdon, Oxfordshire, England (Advanced Plasmamethod demonstrated at the Trail Road Plant in
Power)Ottawa, Canada, which requires lower
Advanced Plasma Power has built a Gasplasmatemperatures and a more robust material (brick)
modular test facility in Faringdon, Oxfordshire thatfor a liner instead of the expensive and fragile
uses refuse-derived fuel feedstock to producemetal.
hydrogen, syngas, energy and vitrified gravel. APPSee also
have also commissioned a commercial test facilityElectric arc
in Swindon, Wiltshire and have plans for a largerPlasma (physics)
100,000-tonnes/yr-sized commercial or municipalStaged reforming
gasplasma facility in the UK.Waste management
Swindon, Wiltshire APPReferences
The heart of this technology, the Gasplasma^ a b "The Recovered Energy System: Discussion
process, forms the basis of APP Swindon Plant,on Plasma Gassification". Retrieved 2008-10-20. 
the first Gasplasma facility in the world.^ "Plasma". Juniper Consultancy Services Limited.
Gasplasma is the sequential use of gasification,^ Alter Nrg / Westinghouse Process Review.
plasma gas treatment, syngas polishing and gasJuniper Consultancy Services Limited. November
engine power generation.2008.
A full scale plant will treat 100,000 short tons^ "National Cheng Kung University - Tainan,
(91,000 t) per annum of municipal waste andTaiwan". PEAT International. Retrieved
produce:2009-04-09. 
Enough power for 10,000 homes^ Williams, Jenkins & Nguyen (2003). "Solid
Enough heat for around 700 homesover 99%Waste Conversion: A review and database of
landfill diversion of feedstock with minimal residuescurrent and emerging technologies" ([dead link]
and emissionsScholar search). University of California Davis,
Increase recycling rates by over 20%Department of Biological and Agricultural
High performance, high-value aggregate glassEngineering, Special Report prepared for the
(trademark Plasmarok)California Integrated Waste Management Board
Novel combination of three existing and provenpursuant to Interagency Agreement IWM-C0172:
technologies (termed Gasplasma)23.
Negative carbon footprint and lowest^ a b Skoloff, Brian (2006-09-10). "Florida county
environmental impact plant and buildingplans to vaporize landfill trash". USA Today.
A full scale plant will be 150 metres (490 ft)Associated Press.
long, 50 metres (160 ft) wide, and along most^ "About the Project". A Partnership for a Zero
of its length only 11 metres (36 ft) high. AboveWaste Ottawa. Retrieved 2009-04-10. 
the thermal plant, the roof height is about^ Czekaj, Laura (7 December 2008). "Mechanical
14 metres (46 ft), and the single exhaust forproblems plague Plasco". Ottawa Sun. Retrieved
the engines 10 metres (33 ft) higher, at only28 December 2008. 
34 metres (110 ft). The building is approximately^ "Plans unveiled for "breakthrough" plasma plant".
the size of a supermarket store and operatesWaste Management News (letsrecycle.com).
under a light vacuum, meaning it contains all odors.2008-02-25. Retrieved 2008-10-20. 
The entire process occurs within the building.^ "Bid for 60m Welsh organic waste park". Waste
Planned facilitiesmanagement News (letsrecycle.com). 2007-08-31.
St. Lucie County, Florida (GeoPlasma)^ Credeur, Mary Jane (2003-06-14). "Start-up will
The first plasma-based waste disposal system inturn tires into electricity". Atlanta Business
the USA was announced in 2006 in St. LucieChronicle.
County, Florida. The county stated that it hopes^ "Plasco forms R&D partnership". PR
to not only avoid further landfill, but completelyNewswire. 2009-02-05. Retrieved 2009-02-08. 
empty its existing landfill 4,300,000 short tons^ "Plasco moving on schedule". 2009-06-01.
(3,900,000 t) of waste collected since 1978Retrieved 2009-07-19. 
within 18 years. The plant was scheduled toExternal links
come into operation in 2009. However, no permitsAlter NRG Corp, Plasma Gasification
as yet have been submitted for construction.InEnTec Chemical, Sustainable Technology for
Backers have announced that the facility wouldIndustry
produce 600 short tons (540,000 kg) of solidWaste-to-Energy Plasma Systems
rubble from around 3,000 short tonsThe Gasification Technologies Council (GTC)
(2,700,000 kg) of waste per day at 5,500 CWaste Vitrification Systems Lessons Learned
(9,900 F). Uncertainties have arisen howeverarticle on Joseph Longo's Plasma Converter 2/19
regarding the safety of such a facility. The public2007
and environmental threats from incineratorsStarTech Environmental, producer of plasma
coupled with the uncertainty of the community'sconverters.longer version of above article from
ability to produce such large quantities of waste"How Plasma Converters Work" at
consistently have led GeoPlasma to submit a newCan We Turn Garbage Into Energy?: The pros
proposal for a much smaller facility that wouldand cons of plasma incineration
convert 200 short tons (180 t) of waste perPlascon - Plasma arc destruction of organic
day.compounds - greenhouse gases such as
Vancouver, British Columbia, Canada (Plascorefrigerants, ODSs, PCBs, Pesticides
Energy Group Inc.)Westinghouse Plasma Corporation, A division of
A proposed Plasma arc gasifier has been plannedAlter NRG Corp.
for the Metro Vancouver area. However residentsAlter NRG Corp, What is Gasification?
of the area have protested. Metro Vancouver isPhoenix Solutions Co.